RENEWABLES
Exceptional support is at the heart of all our operations — bespoke services that enable our clients to thrive
With our collective future firmly in mind, Global Energy Group is invested in making progress towards major sustainability targets and goals to ensure we create a better environment. This extends to the range of specialist services we offer to the fast-growing Renewables sector.
Our Renewables capabilities include:
Maintenance works — inspection, clean down, mechanical/electrical repair and installation, weld repair, follow-up NDT inspections.
Specialist access works — conventional/system scaffold, rope access solutions, tension netting, modular decking, specialist cradle/basket systems and powered-access options.
Port and logistics management — Port of Nigg facility with deep water quaysides, substantial laydown areas, on-site engineering/fabrication support, extensive storage, project offices, heavy mobile/crawler cranes, specialist personnel, accommodation and catering services.
Our Facilties

Scotland’s world-class energy industry port.
Strategically located in the Cromarty Firth, with direct access to the North Sea, our Port of Nigg facility is widely recognised for its multi-sector capability — a renewables hub offering unique turnkey solutions to customers in the international energy business.
SITE BOUNDARY
CONSTRUCTION YARD
COVERED FABRICATION
DEEP-WATER QUAYSIDE
FACILITIES
Shop Overhead Crane Lifting Capacity
- Up to 120t with up to 35m Hook Height
Mobile Crane Capacity
- Up to 1200t
Security
- 24 hour security provision supported by high definition CCTV
On-site Training Facility
- Nigg Skills Academy
CONTACTS
Charlie Morrison
Operations Director
+44 (0) 1862 851700
Rory Gunn
Facilties Director
+44 (0) 1862 851700

FACILITIES
Facility Scope
- Fabrication, Piping, Structural, Assembly & Load out
Construction Yard
- 300m of quayside, 14m water depth, 180,000sq,ft fabrication/warehouse
Covered Fabrication
- 12,550m²
Quayside
- Up to 14m LAT
Shop Overhead Crane Lifting Capacity
- 80t with up to 22m Hook Height
Mobile Crane Capacity
- Up to 1000t
CONTACTS
Facility Contact
+44 (0)1349 832000

FACILITIES
Facility Scope
- Fabrication, Piping, Structural, Assembly & Load out
Quayside
- Up to 9m LAT
Office Space
- 220m²
Clipper Quay Assembly Area
- (L) 45M x (W) 37M
York Street Yard
- (L) 40 x (W) 40
UNIT E
Covered Fabrication - 558m2
Crane Capacity - 1 x 20 te, 1 x 10 tx
Hook Height - 6.5m
UNIT F
Covered Fabrication - 558m2
Crane Capacity - 1 x 20 te, 1 x 10 tx
Hook Height - 6.5m
UNIT K
Covered Fabrication - 901m2
Crane Capacity - 1 x 10 te, 1 x 5 tx
Hook Height - 7.5m
UNIT L
Covered Fabrication - 901m2
Crane Capacity - 1 x 10 te, 1 x 5 tx
Hook Height - 7.5m
CONTACTS
Facility Contact
+44 (0)1224 725345